Projects

Home > Projects

Our Projects

Our Projects

A legacy of excellence across the Middle East and North Africa

Project 01

Ataka Power Plant 2x300MW DCS retrofit project

EMERSON, Egypt 2004

Project 02

Damietta CCPP 1230MW DCS migration project

EMERSON, Egypt 2006

Project 03

New Talkha & Kurimat II CCPP 750 MW DCS installation and commissioning project

EMERSON, Egypt 2007-2009

Project 04

SHOAIBA ST PP 3x250 MW DCS retrofit project

EMERSON, Saudi 2009-2010

Project 05

PP4 GT-Al Riyadh PP GE 2x25 MW DCS Retrofit project

EMERSON, Saudi 2009

Project 06

El Kurimat III 750MW Project

INITEC Spain Co., Egypt 2010

Project 07

Al Arish 2x30 MW STPP DCS migration project

EMERSON, Egypt 2011-2012

Project 08

Old Talkha 210 MW TCS unit2 retrofit Project

EMERSON, Egypt 2011

Project 09

Solar Energy Kurimat PP

IBDROLA, Spain Co., Egypt 2011

Project 10

SEC4A-Al Jouf Fiat GT 7x35 MW-GT DCS Upgrade

EMERSON, Saudi 2009-2012

Project 11

SEC4A Al Quryat BBC GT 2x22 MW DCS Upgrade

EMERSON, Saudi 2013

Project 12

Oman - SUR IPP-CCPP 2000MW

EMERSON, DAEWOO Korean Co., Sur, Oman 2014

Project 13

Rabigh II – 2x300 MW DCS Modernization Project

EMERSON, Saudi 2014

Project 14

Marafiq Yanbu II 3x270 MW – NEW DCS Project

EMERSON – HANWHA Korean Co., Saudi 2014-2017

Project 15

El Kurimat I 2x650 MW- DCS Migrations Project

EMERSON, Egypt 2015-2016

Project 16

Makkah 6x65 MW GE-GT - DCS Upgrading Project

EMERSON, Saudi Mar 2016

Project 17

Al Qaseem Power Station Westinghouse GT 9x50 MW-GT – GT9-FCV, OST, HP&LP valves replacement by new REGZA valves Upgrade

Saudi FAL Co., Saudi Apr 2017

Project 18

West Damietta Power Station CCPP GT 4x125 & 1x250 MW-GT

GE and Orascom Co., New Damietta, Egypt Oct 2017

Project 19

Yanbu I & II Marafiq Co. – HCD Senior Consultant, Utility and Engineering practice

LEORON Co., Yanbu, Saudi Oct 2019

Project 20

El Esraa Co. – petroleum Tanker ship

Alexandria, Egypt Oct 2020

Project 21

SHOAIBA POWER PLANT STAGE I, PHASE 1 DCS Re-Hungarian project

EMERSON, Saudi Jan 2021 up to 2022

Project 22

UPGRADE DISTRIBUTED CONTROL SYSTEMS–BI-10-07853 ABQAIQ Aramco PLANTS CONSTRUCTION SCOPE OF WORK (FOR PIB-2/5/6/7/8/10/12/13/14/16/17&18)

Emerson/Saudi Fal Nov 2022 up to 2023

Our Projects

We’ve successfully completed numerous projects in Egypt and the Middle East region, including:

WhatsApp Image 2025-11-11 at 1.07.59 PM

New Talkha & Kurimat II CCPP 750 MW “2 Projects” EMERSON – Egypt 2007 – 2009.

DCS Installation, HW/SW Modifications, configuring DCS for normal operation . Commissioning, start up Activities and powering up system.
Owner staff Training courses - DCS plant O&M courses.

WhatsApp Image 2025-11-10 at 10.42.42 PM

Ataka PP 2x300MW 2x150MW ST - DCS retrofit project (EMERSON – Egypt 2004).

Removal old panels, New DCS Installation and replacement Supervision. Commissioning and Startup, Normalize DCS system units back to commercial operation. Owner staff Training courses - DCS plant O&M courses.

WhatsApp Image 2025-11-11 at 1.07.59 PM (1)

Damietta CCPP 1230MW DCS Migration project (EMERSON – Egypt 2006).

New DCS parts installation commissioning and Startup, Normalize DCS system units back to commercial operation. Owner staff Training courses - DCS plant O&M courses.

WhatsApp Image 2025-11-10 at 10.49.55 PM

PP4 GT-Al Riyadh PP GE 2x25 MW DCS Retrofit project (EMERSON) Saudi – 2009.

GE-GT Loop and Device check Commissioning and startup plus.
DCS Ovation Operation training - Owner Staff Training courses - DCS plant O&M courses.

WhatsApp Image 2025-11-11 at 1.07.59 PM (2)

New Talkha CCPP 750 MW Project INITEC – Spain Co. – Egypt 2009.

Alsohm DCS IO loop and I&C device Commissioning Team.

WhatsApp Image 2025-11-10 at 10.33.20 PM

Al Arish 2x30 MW STPP DCS migration project – EMERSON – Egypt 2011-2012.

DCS Complete Removal and Installation scope and DCS migration activities.
Plant device check and test, commissioning plant systems and back to normal operation. Owner staff Training courses - DCS plant O&M Courses.

WhatsApp Image 2025-11-10 at 10.49.55 PM

SEC4A-Al Jouf Fiat GT 7x35 MW-GT DCS Upgrade (EMERSON) Saudi – 2009-2012

New DCS Installation supervision, SW installation, powering up DCS system and make it ready for GT commissioning and start up.
GT’s IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.
Guarantee period is our scope plus Owner staff Training courses - DCS plant O&M courses.

WhatsApp Image 2025-11-11 at 1.31.07 PM

Rabigh II – 2x300 MW DCS Modernization Project (EMERSON) - Saudi – 2014.

Plant IO loop, Device checks, commissioning and startup units normalized to normal operation all systems and back to commercial operations by Owner Saudi electricity

WhatsApp Image 2025-11-10 at 10.49.55 PM

SEC4A Al Quryat BBC GT 2x22 MW DCS Upgrade (EMERSON) Saudi – 2013

New DCS Installation supervision, SW installation, powering up DCS system and make it ready for GT commissioning and start up. GT’s IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.

WhatsApp Image 2025-11-11 at 1.42.35 PM (1)

Oman - SUR IPP-CCPP 2000MW - EMERSON - DAEWOO Korean Co Sur - Oman – 2014

New Ovation DCS – APS “Automatic Plant Start” SW program check, troubleshooting modification to make it work as one PB plant start. Plant systems commissioning and start-up.

WhatsApp Image 2025-11-10 at 10.34.48 PM

El Kurimat I 2x650 MW- DCS Migrations Project (EMERSON) Egypt 2015 - 2016.

Site management, Supervising, Inspect and checkout the new DCS parties removal and replacement new DCS – very tight schedule to complete the upgrading.
Startup and commissioning the new DCS and powering system configuring it for normal operations.
Plant devices check and test “DB, Graphics, Logic …” HW/SW modifications. Cold/Hot test activities for plant devices and normalizing DCS back to normal commercial operation. Owner Training courses - DCS plant O&M courses.

New Talkha & Kurimat II CCPP 750 MW “2 Projects” CMI – Balgem Co. – Egypt 2007 – 09

HRSG Boiler Commissioning, Startup and Operation Team.

SHOAIBA ST PP 3x250 MW - DCS Retrofit Project (EMERSON) – Saudi 2009-2010.

Plant IO loop, Device check, commissioning and startup normalizing the system and beck to commercial operation

El Kurimat III 750MW Project INITEC Spain Co. - Egypt 2010

Alsohm DCS IO loop and I&C device Commissioning Team.

SHOAIBA-Saudi lime water plant EMERSON - Saudi 2010.

Engineering (DB, logic, Graphics) SW ready for FAT

Rabigh 4 x 300 MW PP - DCS upgrading project EMERSON Saudi 2009-2011

DCS SW/HW Installation and programming, Commissioning, start-up, powering up DCS system, normalizes operation and ready for Plant commissioning.
Plant IO loop, Device checks, commissioning and startup units normalized to normal operation all systems and handing over to Owner staff for commercial operations by Saudi electricity.
Owner staff Training courses - DCS plant O&M courses.

Al Arish 2x30 MW STPP DCS migration project – EMERSON – Egypt 2011-2012

DCS Complete Removal and Installation scope and DCS migration activities.
Plant device check and test, commissioning plant systems and back to normal operation.
Owner staff Training courses - DCS plant O&M Courses.

Old Talkha 210 MW TCS unit2 retrofit Project EMERSON - Egypt 2011.

Removing the old TCS control cabinets and install the new Ovation DCS system – complete installation scope.

Solar Energy Kurimat PP – IBDROLA- Spain Co. Egypt 2011.

Plant Commissioning, Startup and Operation IBDROLA scope.

SEC4A-Al Jouf Fiat GT 7x35 MW-GT DCS Upgrade (EMERSON) Saudi – 2009-2012

New DCS Installation supervision, SW installation, powering up DCS system and make it ready for GT commissioning and start up.
GT’s IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.
Guarantee period is our scope plus Owner staff Training courses - DCS plant O&M courses.

SEC4A Al Quryat BBC GT 2x22 MW DCS Upgrade (EMERSON) Saudi – 2013.

New DCS Installation supervision, SW installation, powering up DCS system and make it ready for GT commissioning and start up. GT’s IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.

19.Rabigh II – 2x300 MW DCS Modernization Project (EMERSON) - Saudi – 2014.

Plant IO loop, Device checks, commissioning and startup units normalized to normal operation all systems and back to commercial operations by Owner Saudi electricity.

Marafiq Yanbu II 3x270 MW – NEW DCS Project (EMERSON – HANWHA Korean Co,) Saudi 2014-2017

DCS HW/SW modifications system configuration.
PLANT’s IO loop, Device check, Commissioning and Start up Scope.
Warrantee Period covered by PAT engineer

El Kurimat I 2x650 MW- DCS Migrations Project (EMERSON) Egypt 2015 - 2016.

Site management, Supervising, Inspect and checkout the new DCS parties removal and replacement new DCS – very tight schedule to complete the upgrading.
Startup and commissioning the new DCS and powering system configuring it for normal operations.
Plant devices check and test “DB, Graphics, Logic …” HW/SW modifications.
Cold/Hot test activities for plant devices and normalizing DCS back to normal commercial operation. Owner Training courses - DCS plant O&M courses

Makkah 6x65 MW GE-GT - DCS Upgrading Project (EMERSON) Saudi Mar 2016

GT3 – Start-up, operation troubleshooting and solution.

Al Qaseem Power Station Westinghouse GT 9x50 MW-GT – GT9-FCV, OST, HP&LP valves replacement by new REGZA valves Upgrade (Saudi FAL Co.) Saudi – Apr 2017

New FCV Installation supervision, SW installation, ready for GT commissioning and start up.
GT9 IO loop, device check and plant Commissioning and normalizing the units after reliability test and back to commercial operation by Saudi electricity co.

West Damietta Power Station CCPP GT 4x125 & 1x250 MW-GT – (GE and Orascom Co.) New Damietta - Egypt – Oct 2017

I&C commissioning scope “4 HRSG, BOP, STG, ACC plants”
IO cold / Hot loop test “4 HRSG, BOP, STG, ACC plants”
Plant Devices Functional test “4 HRSG, BOP, STG, ACC plants”,

25.Yanbu I & II Marafiq Co. – HCD Senior Consultant, Utility and Engineering practice – (LEORON Co.) Yanbu - Saudi – Oct 2019

Work flow procedures improvements, established Academy for Marafiq training center Creating training materials courses for Engineers/Supervisors and technicians, for Operation and maintenance courses,

El Esraa Co. – petroleum Tanker ship Alexandria - Egypt – Oct 2020

Our team carried out the necessary trouble shooting in electrical generator systems switch gears and emergency and PLC’s, our team completed his task and handing over the ship to the first engineer within 10 days after ship was stopped for years.

SHOAIBA POWER PLANT STAGE I, PHASE 1 DCS Re-Habitation project Emerson /GIZA system Jan 2021 up to 2022

PAT worked together with the GIZA/Emerson team on the SHOAIBA POWER PLANT STAGE I, PHASE 1 DCS Re-Habitation project “ABB to EMERSON Ovation” from January 2021 to 2022. The project involved various activities, including IO loop checks, device tests, and commissioning of boiler, turbine, BOP, desalination, and demi water, as well as troubleshooting of the DCS Ovation system with the Emerson team.

The PAT team provided comprehensive support throughout the project, and the project construction schedule was very tight to return the power plant into commercial operation. The project involved multiple technical aspects, and collaboration between different teams with varied expertise was required to ensure successful completion.

UPGRADE DISTRIBUTED CONTROL SYSTEMS–BI-10-07853 ABQAIQ Aramco PLANTS CONSTRUCTION SCOPE OF WORK (FOR PIB-2/5/6/7/8/10/12/13/14/16/17&18) – Emerson/Saudi Fal Nov 2022 up to 2023

PAT worked together with SF/Emerson team on a project in collaboration with KBR design company. The project involved various activities, including engineering document review, verification of cabinet/marshaling staging before FAT, supervision of construction activities, commissioning of hot/cold tests for each PIB shutdown, and troubleshooting of the Delta V system with Emerson team.

PAT team provided comprehensive support throughout the project, Overall, project was complex, involved multiple technical aspects, and required collaboration between different teams with varied expertise to ensure successful completion.

Our Statistics

Over years of experience
0%
Over skilled engineers and technicians
0%
international partnerships
0%
More than successful projects
0%

We aim to build long-term relationships with our clients based on trust, efficiency, and excellence.

+201099912020

24/7 Support for Your Business

Our Projects

Ataka Power Plant

Damietta CCPP 1230MW

New Talkha & Kurimat II CCPP 750MW

Shoaiba ST PP 3x250MW

SUR IPP-CCPP 2000MW

Rabigh II 2x300MW DCS Modernization